What we do

-Our aim is to do your job as safely, cleanly and quickly as possible.

-------------------------------------------------------------------------------------------------------------------------------------------------------------------

1: Upon arrival we will park in the safest place possible to enable us to pump.

 

2: We will discuss with you how your particular job will be completed.

 

3: We will lay out the pipe line and prepare for the concrete lorry to arrive.

 

4: When the concrete lorry arrives we will pump the concrete for you, we will endevour to get the levels as close as possible and will help out as much as we can.

 

5: When you have the concrete you require, we will dismantle the pipe line.

 

6: We will clean up any mess created as much as possible before leaving.

-------------------------------------------------------------------------------------------------------------------------------------------------------------------

What we need:- 

 

-A bag of cement - required for grouting the pipe line prior to pumping, unfortunately we can't carry it on the lorry.

Somewhere to dispose of 2/3 barrow loads of wash out, once the pumping is completed. (alternative arrangements can be discussed)

 

-A water connection - for washing down afterwards..(alternative arrangements can be discussed)